Craftsman Rehab
A circa 1915 Craftsman receives a well deserved restoration
Friday, April 4, 2014
Saturday, November 9, 2013
Smooth Operator
Back to our regularly program--
The kitchen cabinets are being painted (white). A full-height subway tile splash is being installed behind the range and stainless steel hood.
The woodwork in the Living Room is being scraped of any existing wall paint, to create a cleaner edge between the woodwork and the walls.
The walls are being patched and textured (smooth). The spaces appear much brighter with the white finish.
The kitchen cabinets are being painted (white). A full-height subway tile splash is being installed behind the range and stainless steel hood.
The woodwork in the Living Room is being scraped of any existing wall paint, to create a cleaner edge between the woodwork and the walls.
Monday, July 8, 2013
Thursday, June 20, 2013
Tuesday, June 11, 2013
Thursday, May 30, 2013
Sconces
Ordered two wall sconces from Tap Lighting. The sconces will be installed adjacent to the fireplace. The sconces will illuminate the dark wood mantel, and add symmetry to the long wall.
Saturday, May 25, 2013