Saturday, November 9, 2013

Smooth Operator

Back to our regularly program--

The walls are being patched and textured (smooth).  The spaces appear much brighter with the white finish.


The kitchen cabinets are being painted (white).  A full-height subway tile splash is being installed behind the range and stainless steel hood.


The woodwork in the Living Room is being scraped of any existing wall paint, to create a cleaner edge between the woodwork and the walls. 

Monday, July 8, 2013

Going green

deciding between these two paint colors for the Living Room

Thursday, June 20, 2013

Inspection

The first inspection passed without any issues. 

I was concerned with the built-up shower. But it passed. 
 

Thursday, May 30, 2013

Sconces

Ordered two wall sconces from Tap Lighting.  The sconces will be installed adjacent to the fireplace.  The sconces will illuminate the dark wood mantel, and add symmetry to the long wall.

Saturday, May 25, 2013

Studs

The walls around the proposed bathroom, closet, and powder room have been framed.